Friday, October 26, 2007
Week 8 :: Part 1
Wednesday, October 24, 2007
Week 7 :: Part 2
Week 7 :: Part 1
Week 6 :: Part 3
Week 6 :: Part 2
Week 6 :: Part 1
New third member with a fresh coat of paint. Ready to begin installing the 4:11's
The fixture to hold the thrid member is actually for transmissions, but it worked well.
Pinion assembled. Took two crush collars to get the right loading, but I had one extra so it wasn't a big deal. Needed a big torque wrench though.
All the parts of the pinion ready to be assembled.
Pinion installed in the housing.
Week 5 :: Part 4
Week 5 :: Part 3
Week 5 :: Part 2
Week 5 :: Part 1
Week 4 :: Part 4
Week 4 :: Part 3
Subscribe to:
Posts (Atom)


